Management in Design-Build Projects by Construction Management Consultants: SEM-PLS and IPMA Approaches
Abstract
Keywords
Full Text:
PDFReferences
[1] T. Abi-Karam. “Design/build selection process - Art or science?” In: Cost Engineering 47.5 (2005), pp. 14–19.
[2] M. Fathi and P. P. Shrestha. “Performance Comparison of Design-Build Projects for Highways and Buildings”. In: Construction Research Congress 2018: Infrastructure and Facility Management. 2018, pp. 139–149. doi: 10.1061/9780784481295.015.
[3] P. Lahdenperä. “Design–Build with a Development Phase: An Initiation and the First Trials”. In: Construction Economics and Building 24.4–5 (2024), pp. 18–42. doi: 10.5130/AJCEB.v24i4/5.8471.
[4] S. Buchanan, B. Gallagher, and G. Southern. “Project management: Involve contractors early”. In: Chemical Processing 82.7 (2020), pp. 28–34.
[5] A. Johnson. “It doesn’t have to be that way! Part 2 of 3”. In: Modern Steel Construction 43.2 (2003), pp. 48–50.
[6] S.-H. Ji, H.-S. Lee, and M. Park. “Analyzing characteristics of design build delivery system in Korea”. In: Automation and Robotics in Construction. 2007, pp. 515–521.
[7] B. Xia, A. P. C. Chan, and M. Skitmore. “A classification framework for design-build variants from an operational perspective”. In: International Journal of Construction Management 12.3 (2012), pp. 85–99. doi: 10.1080/15623599.2012.10773196.
[8] M. Kirui and K. Samson. “Influence of Project Planning on Implementation of Road Construction Projects in Kilifi County”. In: Strategic Journal of Business & Change Management (2023). doi: 10.61426/sjbcm.v10i4.2754.
[9] J. Crispim, L. H. Silva, and N. Rego. “Project risk management practices: the organizational maturity influence”. In: International Journal of Managing Projects in Business (2018). doi: 10.1108/IJMPB-10-2017-0122.
[10] A. Mishra, S. Das, and J. Murray. “Risk, Process Maturity, and Project Performance”. In: Production and Operations Management 25 (2016), pp. 210–232. doi: 10.1111/poms.12513.
[11] N. Mwelu et al. “Compliance mediating role within road construction regulatory framework”. In: Journal of Public Procurement 20 (2020), pp. 209–233. doi: 10.1108/jopp-12-2018-0052.
[12] E. Yu. Omelchenko and E. Bychkova. “Compliance Audit in Public Procurement”. In: Ekononomika i Upravlenie: Problemy, Resheniya (2025). doi: 10.36871/ek.up.p.r.2025.02.07.013.
[13] D. Aloyce, R. Monko, and V. Luvara. “Critical audit indicators for assessing construction projects performance”. In: International Journal of Construction Management 24 (2023), pp. 530–539. doi: 10.1080/15623599.2023.2179682.
[14] E. Gashi and M. Ivezaj. “Quality management for design–bid-build versus design-and-build contracts”. In: International Review of Applied Sciences and Engineering (2023). doi: 10.1556/1848.2023.00730.
[15] B. Kocot, D. Gransberg, and R. Tapia. “Design Quality Audits: A Design-Build Claims Avoidance Tool”. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction (2024). doi: 10.1061/jladah.ladr-1030.
[16] R. Moran, I. Odeh, and B. Ashuri. “Optimizing Quality Control and Assurance of Design-Build Transportation Projects”. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction (2024). doi: 10.1061/jladah.ladr-1037.
[17] L. Ika. “Opening the black box of project management”. In: International Journal of Project Management 33 (2015), pp. 1111–1123. doi: 10.1016/J.IJPROMAN.2015.01.005.
[18] S. B. H. Oglu, B. A. J. Oglu, and K. M. A. Oglu. “The effect of quality control on efficiency in construction projects”. In: Economics and Region (2023). doi: 10.26906/eir.2023.1(88).2871.
[19] H. Zhang and Z. Zou. “Quality assurance for building components through point cloud segmentation”. In: Automation in Construction (2023). doi: 10.1016/j.autcon.2023.105045.
[20] D. Ekström, R. Rempling, and M. Plos. “Integrated project team performance in early design stages”. In: Architectural Engineering and Design Management 15 (2019), pp. 249–266. doi: 10.1080/17452007.2018.1563521.
[21] A. Rumane. “Auditor/auditing team selection for construction projects”. In: Quality Auditing in Construction Projects. Taylor & Francis, 2019. doi: 10.1201/9781351201872-5.
[22] C. Wu et al. “How safety leadership works among owners, contractors and subcontractors”. In: International Journal of Project Management 34 (2016), pp. 789–805. doi: 10.1016/J.IJPROMAN.2016.02.013.
[23] S. Ghafoor et al. “Compliance risks in the construction of residential buildings”. In: Smart and Sustainable Built Environment (2025). doi: 10.1108/sasbe-11-2024-0507.
[24] L. H. Nguyen and T. Watanabe. “The Impact of Project Organizational Culture on the Performance of Construction Projects”. In: Sustainability 9 (2017), p. 781. doi: 10.3390/SU9050781.
[25] L. J. De Sousa, J. P. Martins, and L. Sanhudo. “Predicting construction project compliance with machine learning model”. In: Engineering, Construction and Architectural Management (2024). doi: 10.1108/ecam-09-2023-0973.
[26] L. Feng and Z. Wang. “Developing Proactive Compliance Mechanisms for Chinese International Construction Contractors”. In: Buildings (2025). doi: 10.3390/buildings15091478.
[27] J. Smith et al. “The antecedents of construction project change”. In: Journal of Engineering, Design and Technology (2021). doi: 10.1108/JEDT-12-2020-0507.
[28] S. Chathuranga et al. “Practices Driving the Adoption of Agile Project Management Methodologies”. In: Buildings (2023). doi: 10.3390/buildings13041079.
[29] A. Raouf and S. Al-Ghamdi. “Framework to Evaluate Quality Performance of Green Building Delivery”. In: Buildings (2021). doi: 10.3390/buildings11100473.
[30] J. Alencastro, A. Fuertes, and P. De Wilde. “Investigating the influence of quality management on building thermal performance”. In: Engineering, Construction and Architectural Management (2023). doi: 10.1108/ecam-11-2021-1061.
[31] G. Weerasuriya, S. Perera, and R. Calheiros. “Technological imperatives for issues in certification of quality, progress, and payments”. In: Construction Economics and Building (2025). doi: 10.5130/ajceb.v25i1.8680.
[32] I. Rathnayake, G. Wedawatta, and A. Tezel. “Smart Contracts in the Construction Industry”. In: Buildings (2022). doi: 10.3390/buildings12122082.
[33] K. et al. Sigalov. “Automated Payment and Contract Management in the Construction Industry”. In: Applied Sciences (2021). doi: 10.3390/app11167653.
[34] B. S. et al. Alotaibi. “Building information modeling (BIM) adoption for enhanced legal and contractual management”. In: Ain Shams Engineering Journal (2024). doi: 10.1016/j.asej.2024.102822.
[35] A. I. Zahari et al. “Ethical Culture and Leadership for Sustainability and Governance”. In: Journal of Open Innovation (2024). doi: 10.1016/j.joitmc.2024.100219.
[36] E. Galaz-Delgado et al. “Problems and Challenges in the Interactions of Design Teams”. In: Buildings (2021). doi: 10.3390/buildings11100461.
[37] A. Raouf and S. Al-Ghamdi. “Framework to evaluate quality performance of green building delivery”. In: International Journal of Construction Management 23 (2020), pp. 253–267. doi: 10.1080/15623599.2020.1858539.
[38] A. M. et al. Alawag. “Total quality management in industrialised building system”. In: Ain Shams Engineering Journal (2022). doi: 10.1016/j.asej.2022.101877.
[39] A. K. Mohammed and Md. S. B. Ishak. “Identification of project cultural factors affecting the performance”. In: Alexandria Engineering Journal (2024). doi: 10.1016/j.aej.2023.11.064.
[40] J. F. Hair et al. A Primer on Partial Least Squares Structural Equation Modeling (PLS-SEM). 2nd ed. Thousand Oaks, CA: SAGE Publications, 2019.
[41] M. Sarstedt et al. “Progress in partial least squares structural equation modeling”. In: Psychology & Marketing 39.5 (2022), pp. 1035–1064. doi: 10.1002/MAR.21640.
[42] J. Henseler, G. S. Hubona, and P. A. Ray. “Using PLS path modeling in new technology research”. In: Industrial Management & Data Systems 116 (2016), pp. 2–20. doi: 10.1108/IMDS-09-2015-0382.
DOI: https://doi.org/10.18860/cauchy.v11i1.37117
Refbacks
- There are currently no refbacks.
Copyright (c) 2026 Al Kautzar, Mawardi Amin, Agus Suroso

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Editorial Office
Mathematics Department,
Universitas Islam Negeri Maulana Malik Ibrahim Malang
Gajayana Street 50 Malang, East Java, Indonesia 65144
Faximile (+62) 341 558933
e-mail: cauchy@uin-malang.ac.id

CAUCHY: Jurnal Matematika Murni dan Aplikasi is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.






